location | Bátonyterenye |
function | chocolate factory |
floor area | 9400 m² (phase I.) |
client | Árklub Kereskedelmi Kft. |
scope of project | concept plans, building permit plans |
year of design | 2020-2021 |
status | discontinued during the design phase |
lead designer | TH-Stúdió |
architects | György Hidasi, Ágoston Drippey |
structural engineering | Gyuris 2000 |
MEP engineering | Hivessy és Társa |
electrical engineering | Artrea |
utility networks | TL-Cad |
fire protection | Tűzveszélyes |
road engineering | Útvonal |
environment protection | Varsoft |
fire detection system | Artrea |
soil mechanics | Petik |