location | Budapest X. |
function | office |
floor area | 1230 m² |
client | Hungaropharma Zrt. |
scope of project | intermediate constuction plans |
year of design | 2018 |
status | discontinued during the design phase |
lead designer | TH-Stúdió |
architects | György Hidasi, Dániel Csöndes, Ágoston Drippey, Emese Kölcsey, Gabriella Lipkovics‑György, Eszter Polai, Cecília Tóth |
structural engineering | Gyuris 2000 |
MEP engineering | Hivessy és Társa |
electrical engineering | Artrea |
utility networks | TL-Cad |
fire protection | ZoFe-Fire |
road engineering | Útvonal |
environment protection | Varsoft |
fire detection system | Artrea |
landscape design | PAndapont |
soil mechanics | Alap-Geo |
geodesy | Winkel |
building physics | Györe József |
elevator | KONE |
acoustics | 95 Apszis |