Location | Üllő |
Function | logistics warehouse and office |
Floor area | 39 000 m² |
Client | ROSSMANN Magyarország Kft. |
Scope of project | building permit and construction plans plans |
Year of design | 2023 |
Status | under construction |
Lead designer | TH-Stúdió |
Architects | György Hidasi, Ágoston Drippey, Eszter Polai, Judit Katalin Molnár, Cecília Tóth, Attila Gombos |
BIM model | yes |
Contractor | GOLDBECK |
Structural engineering | Konzol 2006 |
MEP engineering | Gépész Partner |
Electrical engineering | Bajzát és Társa |
Utility networks | IPANEMA |
Fire protection | ZoFe-Fire |
Road engineering | Útvonal |
Environment protection | INETON |
Sprinkler | Totál GTK |
Landscape design | PAndapont |
Geodesy | Winkel |
Elevator | KONE |
Acoustics | 95 Apszis |
Kitchen technology | Design Stúdió |
Explosion protection | Tűzveszélyes |