location | Üllő |
function | logistics warehouse and office |
floor area | 39 000 m² |
client | ROSSMANN Magyarország Kft. |
scope of project | building permit and constuction plans |
year of design | 2023 |
status | under construction |
lead designer | TH-Stúdió |
architects | György Hidasi, Ágoston Drippey, Eszter Polai, Judit Katalin Molnár, Cecília Tóth, Attila Gombos |
BIM model | yes |
contractor | GOLDBECK |
structural engineering | Konzol 2006 |
MEP engineering | Gépész Partner |
electrical engineering | Bajzát és Társa |
utility networks | IPANEMA |
fire protection | ZoFe-Fire |
road engineering | Útvonal |
environment protection | INETON |
sprinkler | Totál GTK |
landscape design | PAndapont |
geodesy | Winkel |
elevator | KONE |
acoustics | 95 Apszis |
kitchen technology | Design Stúdió |
explosion protection | Tűzveszélyes |