Location | Budapest XV. |
Function | warehouse and office |
Floor area | 16 000 m² |
Client | GroundUp Kft. |
Scope of project | building permit plans (phase I and II), record drawings (phase I) |
Year of design | 2021-2022 |
Status | phase 1 completed, phase 2 on hold |
Lead designer | TH-Stúdió |
Architects | György Hidasi, Ágoston Drippey |
Contractor | GOLDBECK |
Structural engineering | Konzol 2006 |
MEP engineering | Hivessy és Társa |
Electrical engineering | Bajzát és Társa |
Utility networks | TL-Cad |
Fire protection | ZoFe-Fire |
Road engineering | Útvonal |
Environment protection | Varsoft |
Fire detection system | Bajzát és Társa |
Landscape design | PAndapont |
Geodesy | Winkel |