location | Budapest XV. |
function | warehouse and office |
floor area | 16 000 m² |
client | GroundUp Kft. |
scope of project | building permit plans (phase I and II), record drawings (phase I) |
year of design | 2021-2022 |
status | completed |
lead designer | TH-Stúdió |
architects | György Hidasi, Ágoston Drippey |
contractor | GOLDBECK |
structural engineering | Konzol 2006 |
MEP engineering | Hivessy és Társa |
electrical engineering | Bajzát és Társa |
utility networks | TL-Cad |
fire protection | ZoFe-Fire |
road engineering | Útvonal |
environment protection | Varsoft |
fire detection system | Bajzát és Társa |
landscape design | PAndapont |
geodesy | Winkel |